2017-052641 SP
SP-2017-0161CT
The applicant is proposing to construct a new hotel, kitchen pavillion, parking lot and pool area with associated improvements.
Site Plan Administrative
Consolidated
The Perry Estate
Approved and Released
May 3, 2017
Jul 9, 2018
Jul 9, 2021
Yes

Application Date 2017-05-03
Are you requesting a 1704/245 Determination? No
Case Manager Christine Barton-Holmes
Deed Volume\Document Number 2016028032
Description of Proposed Development Hotel Construction
Electric Utility Provider COA
Existing Impervious Cover (%) 45
Existing Land Use Commercial Multi-Family
Existing Zoning GR - COMMUNITY COMMERCIAL
Flood Plain No
Gross Site Area (Acres)
Gross Site Area (Square Footage)
Has Smart Housing Been Approved? No
Hill Country or Other Roadway Name
Is a Vertical Mixed Use building proposed? No
Land Development Jurisdiction II Full-Purpose
Limits of Construction [LOC] (Acres) 6.18
Limits of Construction [LOC] (Square Feet) 269200.8
Master Report Due Date 2018-07-19
Neighborhood Plan Name
Proposed Impervious Cover (%) 30
Proposed Land Use Commercial
Proposed Number of Units
Recorded Subdivision Name
Related Cases
Roadway Type Urban Roadway
School District AUSTIN ISD
Shared/Offsite Parking No
Smart Growth Zone DDZ
Variance Code Section
Variance Description(s)
Waiver/Variance Required? No
Wastewater Utility Provider COA
Water Utility Provider COA
Watershed Classification II
Withdraw & Resubmit No
ATD Engineering Review? No
ATD Engineering Reviewer
AW Facility Engineering Review? No
AW Facility Engineering Reviewer Roger Brown
AW Pipeline Engineering Review? Yes
AW Pipeline Engineering Reviewer AWU-Pipeline Engineering
PWD-QMD Review? No
PWD-QMD Reviewer Ben Sanders
Land Development Jurisdiction Full-Purpose
Watershed Classification I Urban Watersheds
Watershed I Waller Creek
Neighborhood Plan Area ? No

4114 RED RIVER ST AUSTIN TX 78751 Address

Applicant Big Red Dog Engineering/Consulting (NSIKANABASI UKO)
2021 W 5TH ST AUSTIN TX
(512) 669-5560
Billed To 4100 Red River Holdings LLC (Clark Lyda)
Georgetown TX 78627
(512) 635-0002
Engineer Big Red Dog, a division of WGI (Amir Namakforoosh)
2021 E. 5th St. Austin TX 78702
(512) 669-5560
Other BIG RED DOG, Inc.
2021 E 5TH ST AUSTIN TX 78702
(512) 669-5560
Interested Party (Mark Harkrider)
Austin TX 78711
512
Interested Party (Maximilian Ekesi)
3801 PETES PATH AUSTIN TX 78731
(512) 577-1866
Interested Party (Regina Henderson)
Austin TX 78751
(512) 924-4456
Interested Party (Dan Richter)
Austin TX 78757
512
Interested Party (rachael biggs)
Austin TX 78751
(512) 914-7066
Interested Party (Chris Pearson)
Austin TX 78751
512
Interested Party (John Wright)
Austin TX 78751
512

Completeness Check Fee $200.00 $0.00
Notification/Renotification $560.00 $0.00
UDS Engineering Plan Review $214.50 $0.00
Consolidated Site Plan-Env/Drainage $1,289.00 $0.00
Consolidated Site Plan-Env/Drainage ($644.50) $0.00
Consolidated Site Plan-Insp $470.00 $0.00
Consolidated Site Plan-Dev $6,754.00 $0.00
Consolidated Site Plan-Dev ($3,377.00) $0.00
Development Services Surcharge $202.06 $0.00
Heritage Tree Administrative Variance $430.00 $0.00
Site-Variance/Waiver-Admin Transport-Planning $792.00 $0.00
Development Services Surcharge $31.68 $0.00
Landscape Inspection $250.00 $0.00
Development Services Surcharge $10.00 $0.00
Site-Variance/Waiver-Admin Transport-Planning $1,386.00 $0.00
Site-Variance/Waiver-Admin Transport-Planning ($792.00) $0.00
Development Services Surcharge $23.76 $0.00

Addressing Review Approved May 12, 2017 May 17, 2017 May 17, 2017 Samuel Adams ((512) 974-6052) 2
Case Manager Review Rejected Jun 22, 2017 Jun 19, 2017 Jun 22, 2017 Christine Barton-Holmes (512-974-2788) 1
Electric Review Rejected Jun 5, 2017 Jun 15, 2017 Jun 5, 2017 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 Leslie Daniel (512-974-6316) 1
Heritage Tree Review Informal Update Req'd Jun 19, 2017 Jun 15, 2017 Jun 19, 2017 Patti Dodson 1
Environmental Review Rejected Jun 21, 2017 Jun 15, 2017 Jun 21, 2017 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Rejected Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 James Reeves (512-974-0193) 1
Flood Plain Review Rejected Jun 14, 2017 Jun 15, 2017 Jun 14, 2017 Henry Price (512-974-1275) 1
Hydro Geologist Review Approved Jun 6, 2017 Jun 15, 2017 Jun 6, 2017 Joan I Balogh 1
Industrial Waste Review Informal Update Req'd May 26, 2017 Jun 15, 2017 May 26, 2017 Sarah Doersam 1
Mapping Review Approved May 19, 2017 May 26, 2017 May 24, 2017 Samuel Adams ((512) 974-6052) 1
PARD / Planning & Design Review Informal Update Req'd Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 Jackie Chuter 1
Planner 1 Review Rejected Jun 22, 2017 Jun 18, 2017 Jun 22, 2017 Cindy Edmond (512-974-3437) 1
Site Plan Review Rejected Jun 8, 2017 Jun 15, 2017 Jun 8, 2017 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Rejected Jun 16, 2017 Jun 15, 2017 Jun 16, 2017 Brad Ward (512-972-0339) 1
R.O.W. Review Informal Update Req'd Jun 16, 2017 Jun 15, 2017 Jun 16, 2017 Reza Sedghy (512-974-7912) 1
Traffic Control Review No Review Required Jun 14, 2017 Jun 15, 2017 Jun 14, 2017 Daniel Hunter (512-974-5672) 1
Transportation Planning Rejected Jun 21, 2017 Jun 15, 2017 Jun 21, 2017 Katie Wettick (512-974-3529 ) 1
AW Utility Development Services Informal Update Req'd May 23, 2017 Jun 15, 2017 May 23, 2017 Neil Kepple (512-972-0077) 1
Water Quality Review Rejected Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 Leslie Daniel (512-974-6316) 1
Wetlands Biologist Review Rejected Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 John Clement (512-974-1475) 1
AW Pipeline Engineering Rejected Jun 15, 2017 Jun 15, 2017 Jun 15, 2017 Alfredo Torres (512-972-0238) 1
Case Manager Review Rejected Aug 21, 2017 Aug 10, 2017 Aug 21, 2017 Christine Barton-Holmes (512-974-2788) 1
Electric Review Rejected Aug 4, 2017 Aug 8, 2017 Aug 4, 2017 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Aug 3, 2017 Aug 8, 2017 Aug 3, 2017 Leslie Daniel (512-974-6316) 1
Heritage Tree Review Informal Update Req'd Aug 18, 2017 Aug 8, 2017 Aug 18, 2017 Patti Dodson 1
Environmental Review Rejected Aug 8, 2017 Aug 8, 2017 Aug 8, 2017 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Rejected Aug 8, 2017 Aug 8, 2017 Aug 8, 2017 James Reeves (512-974-0193) 1
Flood Plain Review Rejected Aug 7, 2017 Aug 8, 2017 Aug 7, 2017 Henry Price (512-974-1275) 1
Industrial Waste Review Approved Jul 31, 2017 Aug 8, 2017 Jul 31, 2017 Sarah Doersam 1
PARD / Planning & Design Review Informal Update Req'd Aug 4, 2017 Aug 8, 2017 Aug 4, 2017 Jackie Chuter 1
Planner 1 Review Rejected Aug 21, 2017 Aug 9, 2017 Aug 21, 2017 Cindy Edmond (512-974-3437) 1
Site Plan Review Rejected Aug 14, 2017 Aug 8, 2017 Aug 14, 2017 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Rejected Aug 7, 2017 Aug 8, 2017 Aug 7, 2017 Brad Ward (512-972-0339) 1
R.O.W. Review Approved Aug 9, 2017 Aug 8, 2017 Aug 9, 2017 Reza Sedghy (512-974-7912) 1
Transportation Planning Rejected Aug 21, 2017 Aug 8, 2017 Aug 21, 2017 Katie Wettick (512-974-3529 ) 1
AW Utility Development Services Informal Update Req'd Jul 28, 2017 Aug 8, 2017 Jul 28, 2017 Neil Kepple (512-972-0077) 1
Water Quality Review Rejected Aug 3, 2017 Aug 8, 2017 Aug 3, 2017 Leslie Daniel (512-974-6316) 1
Wetlands Biologist Review Rejected Jul 27, 2017 Aug 8, 2017 Jul 27, 2017 John Clement (512-974-1475) 1
AW Pipeline Engineering Rejected Aug 8, 2017 Aug 8, 2017 Aug 8, 2017 Alfredo Torres (512-972-0238) 1
Case Manager Review Rejected Dec 14, 2017 Nov 21, 2017 Dec 14, 2017 Christine Barton-Holmes (512-974-2788) 1
Electric Review Rejected Nov 17, 2017 Nov 17, 2017 Nov 17, 2017 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Dec 14, 2017 Nov 17, 2017 Dec 14, 2017 Leslie Daniel (512-974-6316) 1
Heritage Tree Review Approved Nov 22, 2017 Nov 17, 2017 Nov 22, 2017 Patti Dodson 1
Environmental Review Rejected Nov 15, 2017 Nov 17, 2017 Nov 15, 2017 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Rejected Nov 17, 2017 Nov 17, 2017 Nov 17, 2017 James Reeves (512-974-0193) 1
Flood Plain Review Informal Update Req'd Nov 17, 2017 Nov 17, 2017 Nov 17, 2017 Henry Price (512-974-1275) 1
PARD / Planning & Design Review Informal Update Req'd Nov 13, 2017 Nov 17, 2017 Nov 13, 2017 Jackie Chuter 1
Planner 1 Review Rejected Dec 14, 2017 Nov 20, 2017 Dec 14, 2017 Cindy Edmond (512-974-3437) 1
Site Plan Review Rejected Nov 30, 2017 Nov 17, 2017 Nov 30, 2017 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Rejected Nov 16, 2017 Nov 17, 2017 Nov 16, 2017 Brad Ward (512-972-0339) 1
Transportation Planning Rejected Nov 20, 2017 Nov 17, 2017 Nov 20, 2017 Katie Wettick (512-974-3529 ) 1
AW Utility Development Services Informal Update Req'd Nov 8, 2017 Nov 17, 2017 Nov 8, 2017 Neil Kepple (512-972-0077) 1
Water Quality Review Rejected Dec 14, 2017 Nov 17, 2017 Dec 14, 2017 Leslie Daniel (512-974-6316) 1
Wetlands Biologist Review Rejected Nov 14, 2017 Nov 17, 2017 Nov 14, 2017 John Clement (512-974-1475) 1
AW Pipeline Engineering Rejected Nov 19, 2017 Nov 17, 2017 Nov 19, 2017 Alfredo Torres (512-972-0238) 1
Case Manager Review Rejected Feb 26, 2018 Feb 9, 2018 Feb 26, 2018 Christine Barton-Holmes (512-974-2788) 1
Electric Review Rejected Feb 14, 2018 Feb 7, 2018 Feb 14, 2018 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Feb 26, 2018 Feb 7, 2018 Feb 26, 2018 Leslie Daniel (512-974-6316) 1
Environmental Review Informal Update Req'd Feb 8, 2018 Feb 7, 2018 Feb 8, 2018 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Rejected Feb 7, 2018 Feb 7, 2018 Feb 7, 2018 James Reeves (512-974-0193) 1
Flood Plain Review Informal Update Req'd Feb 2, 2018 Feb 7, 2018 Feb 2, 2018 Henry Price (512-974-1275) 1
PARD / Planning & Design Review Approved Feb 7, 2018 Feb 7, 2018 Feb 7, 2018 Jackie Chuter 1
Planner 1 Review Rejected Feb 26, 2018 Feb 8, 2018 Feb 26, 2018 Cindy Edmond (512-974-3437) 1
Site Plan Review Informal Update Req'd Feb 9, 2018 Feb 7, 2018 Feb 9, 2018 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Informal Update Req'd Feb 6, 2018 Feb 7, 2018 Feb 6, 2018 Brad Ward (512-972-0339) 1
Transportation Planning Rejected Feb 9, 2018 Feb 7, 2018 Feb 9, 2018 Katie Wettick (512-974-3529 ) 1
AW Utility Development Services Informal Update Req'd Jan 29, 2018 Feb 7, 2018 Jan 29, 2018 Neil Kepple (512-972-0077) 1
Water Quality Review Rejected Feb 26, 2018 Feb 7, 2018 Feb 26, 2018 Leslie Daniel (512-974-6316) 1
Wetlands Biologist Review Informal Update Req'd Feb 2, 2018 Feb 7, 2018 Feb 2, 2018 John Clement (512-974-1475) 1
AW Pipeline Engineering Rejected Feb 6, 2018 Feb 7, 2018 Feb 6, 2018 Alfredo Torres (512-972-0238) 1
Case Manager Review Rejected Apr 20, 2018 Apr 10, 2018 Apr 20, 2018 Christine Barton-Holmes (512-974-2788) 1
Electric Review Rejected Apr 20, 2018 Apr 6, 2018 Apr 20, 2018 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Apr 16, 2018 Apr 6, 2018 Apr 16, 2018 Leslie Daniel (512-974-6316) 1
Environmental Review Informal Update Req'd Apr 4, 2018 Apr 6, 2018 Apr 4, 2018 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Informal Update Req'd Apr 6, 2018 Apr 6, 2018 Apr 6, 2018 James Reeves (512-974-0193) 1
Flood Plain Review Informal Update Req'd Mar 29, 2018 Apr 6, 2018 Mar 29, 2018 Henry Price (512-974-1275) 1
Planner 1 Review Rejected Apr 20, 2018 Apr 9, 2018 Apr 20, 2018 Cindy Edmond (512-974-3437) 1
Site Plan Review Informal Update Req'd Apr 6, 2018 Apr 6, 2018 Apr 6, 2018 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Informal Update Req'd Apr 6, 2018 Apr 6, 2018 Apr 6, 2018 Brad Ward (512-972-0339) 1
Transportation Planning Informal Update Req'd Apr 5, 2018 Apr 6, 2018 Apr 5, 2018 Katie Wettick (512-974-3529 ) 1
AW Utility Development Services Informal Update Req'd Mar 28, 2018 Apr 6, 2018 Mar 28, 2018 Neil Kepple (512-972-0077) 1
Water Quality Review Approved Apr 16, 2018 Apr 6, 2018 Apr 16, 2018 Leslie Daniel (512-974-6316) 1
Wetlands Biologist Review Informal Update Req'd Mar 30, 2018 Apr 6, 2018 Mar 30, 2018 John Clement (512-974-1475) 1
AW Pipeline Engineering Informal Update Req'd Apr 5, 2018 Apr 6, 2018 Apr 5, 2018 Alfredo Torres (512-972-0238) 1
Case Manager Review Rejected Jun 27, 2018 Jun 26, 2018 Jun 27, 2018 Christine Barton-Holmes (512-974-2788) 1
Electric Review Approved Jun 27, 2018 Jun 22, 2018 Jun 27, 2018 Karen Palacios (512-322-6110) 1
Drainage Engineering Review Rejected Jun 14, 2018 Jun 22, 2018 Jun 14, 2018 Leslie Daniel (512-974-6316) 1
Environmental Review Approved Jun 21, 2018 Jun 22, 2018 Jun 21, 2018 Atha Phillips (512-974-2132) 1
Fire For Site Plan Review Informal Update Req'd Jun 25, 2018 Jun 22, 2018 Jun 25, 2018 James Reeves (512-974-0193) 1
Flood Plain Review Informal Update Req'd Jun 21, 2018 Jun 22, 2018 Jun 21, 2018 Henry Price (512-974-1275) 2
Planner 1 Review Rejected Jun 27, 2018 Jun 25, 2018 Jun 27, 2018 Cindy Edmond (512-974-3437) 1
Site Plan Review Informal Update Req'd Jun 26, 2018 Jun 22, 2018 Jun 26, 2018 Christine Barton-Holmes (512-974-2788) 1
Site Plan Plumbing Approved Jun 21, 2018 Jun 22, 2018 Jun 21, 2018 Cory Harmon (512-974-2882) 2
Transportation Planning Informal Update Req'd Jun 22, 2018 Jun 22, 2018 Jun 22, 2018 Katie Wettick (512-974-3529 ) 2
AW Utility Development Services Informal Update Req'd Jun 14, 2018 Jun 22, 2018 Jun 14, 2018 Neil Kepple (512-972-0077) 1
Wetlands Biologist Review Approved Jun 22, 2018 Jun 22, 2018 Jun 22, 2018 John Clement (512-974-1475) 1
AW Pipeline Engineering Informal Update Req'd Jun 21, 2018 Jun 22, 2018 Jun 21, 2018 Alfredo Torres (512-972-0238) 1
Case Manager Review Approved Jul 9, 2018 Jul 23, 2018 Jul 9, 2018 Christine Barton-Holmes (512-974-2788) 2
Fire For Site Plan Review Closed Jul 19, 2018 Jul 9, 2018 James Reeves (512-974-0193) 0
Flood Plain Review Closed Jul 19, 2018 Jul 9, 2018 Henry Price (512-974-1275) 0
Planner 1 Review Closed Jul 20, 2018 Jul 9, 2018 Cindy Edmond (512-974-3437) 0
Site Plan Review Approved Jul 9, 2018 Jul 19, 2018 Jul 9, 2018 Christine Barton-Holmes (512-974-2788) 1
Transportation Planning Closed Jul 19, 2018 Jul 9, 2018 Katie Wettick (512-974-3529 ) 0
AW Utility Development Services Closed Jul 19, 2018 Jul 9, 2018 Neil Kepple (512-972-0077) 0
AW Pipeline Engineering Closed Jul 19, 2018 Jul 9, 2018 Alfredo Torres (512-972-0238) 0
Early Notification Closed Jun 1, 2017 Jun 2, 2017 Jun 1, 2017 Debra Sustaita (512-974-2193) 1
Drainage Engineering Review Approved Jun 25, 2018 Jun 25, 2018 Jun 25, 2018 Leslie Daniel (512-974-6316) 1
Initial Intake Closed May 3, 2017 May 3, 2017 May 3, 2017 Intake Group 1
Submittal Intake Closed May 19, 2017 Jun 17, 2017 May 19, 2017 Intake Group 1
Initial Distribution Closed May 19, 2017 May 22, 2017 May 19, 2017 Intake Group 1
Adjust Review Due Dates Closed Oct 2, 2017 Jul 9, 2018 Intake Group 0
Awaiting Update Closed Jul 27, 2017 May 7, 2018 Jul 27, 2017 Intake Group 1
Update Distribution Closed Jul 27, 2017 Jul 27, 2017 Jul 27, 2017 Almira Baranovicht ((512)974-2193) 1
Awaiting Update Closed Nov 6, 2017 May 18, 2018 Nov 6, 2017 Intake Group 1
Update Distribution Closed Nov 6, 2017 Nov 6, 2017 Nov 6, 2017 Shelby Pape (512-974-2680) 1
Awaiting Update Closed Jan 26, 2018 Jun 11, 2018 Jan 26, 2018 Intake Group 1
Update Distribution Closed Jan 26, 2018 Jan 26, 2018 Jan 26, 2018 Shelby Pape (512-974-2680) 1
Awaiting Update Closed Mar 27, 2018 Jun 28, 2018 Mar 27, 2018 Intake Group 1
Update Distribution Closed Mar 27, 2018 Mar 27, 2018 Mar 27, 2018 Shelby Pape (512-974-2680) 1
Awaiting Update Closed Jun 12, 2018 Jul 9, 2018 Jun 12, 2018 Intake Group 1
Update Distribution Closed Jun 12, 2018 Jun 12, 2018 Jun 12, 2018 Shelby Pape (512-974-2680) 1
Awaiting Update Closed Jul 9, 2018 Jul 10, 2018 Jul 9, 2018 Intake Group 1
Update Distribution Closed Jul 9, 2018 Jul 9, 2018 Jul 9, 2018 Christine Barton-Holmes (512-974-2788) 1
Completeness Check Letter Closed May 17, 2017 May 15, 2017 May 17, 2017 Planner 1 Review 1
Completeness Check Closed May 17, 2017 Jun 17, 2017 May 17, 2017 Intake Group 1
Case Diary Closed Jul 9, 2018 0
Fiscal and Fee Collection Closed Apr 16, 2018 Apr 16, 2018 Eric Luu (512-974-2771) 1
Grant Application Extension Closed Nov 6, 2017 Jul 9, 2018 Case Manager Review 0

Approved fiscal Download
Floodplain Drainage Easement Download
Parkland dedication fee worksheet Download
Permit Download
SP-2017-0161C Case Info Date Filed 05/19/2017 Formal Submital 05/19/2017 Download
SP-2017-0161C Update 1 Date Filed 7/27/2017 Download
SP-2017-0161C Update 2 Date Filed 11/6/2017 Download
SP-2017-0161CT Update 3 Date Filed 1/26/2018 Download
SP-2017-0161CT Update 4 Date Filed 3/27/2018 Download
SP-2017-0161CT Update 5 Date Filed 6/12/2018 Download
SPL-SP-2017-0161CT_0~001 Download
SPL-SP-2017-0161CT_0~002 Download
SPL-SP-2017-0161CT_0~003 Download
SPL-SP-2017-0161CT_0~004 Download
SPL-SP-2017-0161CT_0~005 Download
SPL-SP-2017-0161CT_0~006 Download
SPL-SP-2017-0161CT_0~007 Download
SPL-SP-2017-0161CT_0~008 Download
SPL-SP-2017-0161CT_0~009 Download
SPL-SP-2017-0161CT_0~010 Download
SPL-SP-2017-0161CT_0~011 Download
SPL-SP-2017-0161CT_0~011(1) Download
SPL-SP-2017-0161CT_0~012 Download
SPL-SP-2017-0161CT_0~013 Download
SPL-SP-2017-0161CT_0~014 Download
SPL-SP-2017-0161CT_0~015 Download
SPL-SP-2017-0161CT_0~016 Download
SPL-SP-2017-0161CT_0~017 Download
SPL-SP-2017-0161CT_0~018 Download
SPL-SP-2017-0161CT_0~019 Download
SPL-SP-2017-0161CT_0~019(1) Download
SPL-SP-2017-0161CT_0~020 Download
SPL-SP-2017-0161CT_0~021 Download
SPL-SP-2017-0161CT_0~022 Download
SPL-SP-2017-0161CT_0~023 Download
SPL-SP-2017-0161CT_0~024 Download
SPL-SP-2017-0161CT_0~024(1) Download
SPL-SP-2017-0161CT_0~025 Download
SPL-SP-2017-0161CT_0~025(1) Download
SPL-SP-2017-0161CT_0~026 Download
SPL-SP-2017-0161CT_0~026(1) Download
SPL-SP-2017-0161CT_0~027 Download
SPL-SP-2017-0161CT_0~027(1) Download
SPL-SP-2017-0161CT_0~028 Download
SPL-SP-2017-0161CT_0~029 Download
SPL-SP-2017-0161CT_0~030 Download
SPL-SP-2017-0161CT_0~030(1) Download
SPL-SP-2017-0161CT_0~031 Download
SPL-SP-2017-0161CT_0~031(1) Download
SPL-SP-2017-0161CT_0~032 Download
SPL-SP-2017-0161CT_0~033 Download
SPL-SP-2017-0161CT_0~034 Download
SPL-SP-2017-0161CT_0~035 Download
SPL-SP-2017-0161CT_0~036 Download
SPL-SP-2017-0161CT_0~036(1) Download
SPL-SP-2017-0161CT_0~037 Download
SPL-SP-2017-0161CT_0~038 Download
SPL-SP-2017-0161CT_0~038(1) Download
SPL-SP-2017-0161CT_0~039 Download
SPL-SP-2017-0161CT_0~039(1) Download
SPL-SP-2017-0161CT_0~040 Download
SPL-SP-2017-0161CT_0~040(1) Download
SPL-SP-2017-0161CT_0~041 Download
SPL-SP-2017-0161CT_0~041(1) Download
SPL-SP-2017-0161CT_0~042 Download
SPL-SP-2017-0161CT_0~043 Download
SPL-SP-2017-0161CT_0~044 Download
SPL-SP-2017-0161CT_0~045 Download
SPL-SP-2017-0161CT_0~046 Download
SPL-SP-2017-0161CT_0~047 Download
SPL-SP-2017-0161CT_0~047(1) Download
SPL-SP-2017-0161CT_0~048 Download
SPL-SP-2017-0161CT_0~048(1) Download
SPL-SP-2017-0161CT_0~049 Download
SPL-SP-2017-0161CT_0~049(1) Download
SPL-SP-2017-0161CT_0~050 Download
SPL-SP-2017-0161CT_0~051 Download
SPL-SP-2017-0161CT_0~052 Download
SPL-SP-2017-0161CT_0~053 Download
SPL-SP-2017-0161CT_0~054 Download
SPL-SP-2017-0161CT_0~055 Download
SPL-SP-2017-0161CT_0~056 Download
SPL-SP-2017-0161CT_0~057 Download
SPL-SP-2017-0161CT_0~058 Download
SPL-SP-2017-0161CT_0~059 Download
SPL-SP-2017-0161CT_0~060 Download
SPL-SP-2017-0161CT_0~061 Download
SPL-SP-2017-0161CT_0~062 Download
SPL-SP-2017-0161CT_0~063 Download
SPL-SP-2017-0161CT_0~063(1) Download
SPL-SP-2017-0161CT_0~064 Download
SPL-SP-2017-0161CT_0~065 Download
SPL-SP-2017-0161CT_0~066 Download
SPL-SP-2017-0161CT_0~066(1) Download
SPL-SP-2017-0161CT_0~067 Download
SPL-SP-2017-0161CT_0~067(1) Download
SPL-SP-2017-0161CT_0~068 Download
SPL-SP-2017-0161CT_0~068(1) Download
SPL-SP-2017-0161CT_0~069 Download
SPL-SP-2017-0161CT_0~069(1) Download
SPL-SP-2017-0161CT_0~070 Download
SPL-SP-2017-0161CT_0~070(1) Download
SPL-SP-2017-0161CT_0~071 Download
SPL-SP-2017-0161CT_0~071(1) Download
SPL-SP-2017-0161CT_0~072 Download
SPL-SP-2017-0161CT_0~072(1) Download
SPL-SP-2017-0161CT_0~073 Download
SPL-SP-2017-0161CT_0~074 Download
SPL-SP-2017-0161CT_0~075 Download
SPL-SP-2017-0161CT_0~075(1) Download
SPL-SP-2017-0161CT_0~076 Download
SPL-SP-2017-0161CT_0~076(1) Download
SPL-SP-2017-0161CT_0~077 Download
SPL-SP-2017-0161CT_0~077(1) Download
SPL-SP-2017-0161CT_0~078 Download
SPL-SP-2017-0161CT_0~079 Download
SPL-SP-2017-0161CT_0~080 Download
SPL-SP-2017-0161CT_0~081 Download
SPL-SP-2017-0161CT_0~081(1) Download
SPL-SP-2017-0161CT_0~082 Download
SPL-SP-2017-0161CT_0~082(1) Download
SPL-SP-2017-0161CT_0~083 Download
SPL-SP-2017-0161CT_0~084 Download
SPL-SP-2017-0161CT_0~085 Download
SPL-SP-2017-0161CT_0~086 Download
SPL-SP-2017-0161CT_0~087 Download
SPL-SP-2017-0161CT_0~088 Download
SPL-SP-2017-0161CT_0~089 Download
SPL-SP-2017-0161CT_0~090 Download
SPL-SP-2017-0161CT_0~091 Download
SPL-SP-2017-0161CT_0~092 Download
SPL-SP-2017-0161CT_0~093 Download
SPL-SP-2017-0161CT_0~094 Download
SPL-SP-2017-0161CT_0~095 Download
SPL-SP-2017-0161CT_0~096 Download
SPL-SP-2017-0161CT_0~097 Download
SPL-SP-2017-0161CT_0~098 Download
SPL-SP-2017-0161CT_0~099 Download
SPL-SP-2017-0161CT_0~100 Download
SPL-SP-2017-0161CT_0~101 Download
SPL-SP-2017-0161CT_0~102 Download
SPL-SP-2017-0161CT_0~103 Download
SPL-SP-2017-0161CT_0~104 Download
SPL-SP-2017-0161CT_0~105 Download
Site visit notes 3/15/18 Download
TCM Waiver Fee Download
Update 5 Master Report Download
Variance request letter for heritage trees Download
cancel-see revised Download
tree report Nov. 2016 Download
update 0 master report Download
update 1 master report Download
update 2 master report Download
update 3 master report Download
update 4 master report Download